J21  65025 – 65123  0-6-0  NER  Worsdell 

 

j21

 

Power Classification 2F
Introduced 1886– 1894
Designer T W Worsdell
Company NER
Weight – Loco 42t 1cwt (Superheated engines 43t 15cwt – 427 19cwt when superheating removed)
               Tender 36t 19cwt
Driving Wheels 5ft 1¼ins
Boiler Pressure 160psi (some 160psi superheated)
Cylinders Inside – 18in x 24in (Superheated engines 19in x 24in)
Tractive Effort 17,265lbf (19,240 for superheated engines)
Valve Gear Joy (slide valve) – (Superheated engines Stephenson – Piston valves)

On arriving at the North Eastern Railway (NER) in 1881, T W Worsdell found an urgent need for goods locomotives. The NER required goods engines that were more powerful at a time when the earlier NER goods engines were due for withdrawal. The most recent NER goods engines were the unsatisfactory McDonnell LNER class J22. T W Worsdell had recently designed the successful J15 goods locomotive for the Great Eastern Railway, and his new design for the NER, the Class C (LNER J21), had a number of external similarities. They were more powerful than the J15s, and they were fitted with large comfortable cabs that were noted for their convenience. The new J21s also had similarities with the earlier Fletcher goods engines, but the J21s represented a significant step forward with their larger cylinders and fireboxes.

 j15 small J15 introduced by T W Worsdell on the GCR in 1883
 j21 J21 introduced by T W Worsdell in 1886

The J21s were built with both simple and compound expansion. Class C1 had 18in x 24in simple expansion cylinders, whilst class C used Worsdell-von Borries compound expansion. The compound cylinders also had a stroke of 24in, but they were 18in and 26in diameter. Both versions used Joy valve gear. T.W. Worsdell simultaneously introduced corresponding compound and simple LNER classes N8 and N9 0-6-2Ts.

 j21 J21 introduced by T W Worsdell in 1886
 n8 small N8 introduced by T W Worsdell in 1886 as a compound tank engine version of the J21
 n9 small N9 Introduced by W Worsdell in 1893 as simple version of the N8

A total of 201 J21s were built between 1886 and 1894, of which 171 were C compounds and 30 were C1 simples.

In a report to the Institution of Mechanical Engineers, Worsdell reported that the compound locomotives operating at 160psi showed a saving of 14.5% in coal consumption over the simple locomotives operating at 140psi. This was based on trains operating between Newcastle, York, and Leeds. A second type of compound locomotive was introduced in 1891, when 107 was built with Smith’s piston valves. This was tested against the other compound locomotives, but the results are unknown.

T W Worsdell retired in 1890 due to ill health, but stayed with the NER as a consultant for two years. He was succeeded by his brother W. Worsdell, who had a dislike of compounding. W. Worsdell had a free hand by 1893 and he re-ordered the last two batches of J21s to be built with simple expansion. He was not an advocate of Joy valve gear either, but the required valve gear had been pre-ordered, so this was used for the final J21s. Further construction of NER goods engines would be to W. Worsdell’s own designs starting with the class P (LNER class J24) locomotives.

 j21 J21 introduced by T W Worsdell in 1886
 j24 small J24 introduced by W Worsdell in 1894

It appears that day-to-day operations did not realise the initially reported coal savings. As early as 1893, the Locomotive Committee requested a report from W. Worsdell regarding the working of the NER’s compounds, including coal consumption and failures to start and stop. After considering the report, the Locomotive Committee decided in 1894 to consider conversion of all compounds to simple expansion. Priority was given to the passenger compound locomotives, and it was not until 1901 that the first of the Class C locomotives was rebuilt. Eventually all of the class C compounds were rebuilt as C1 simples with the last being rebuilt in 1913. From June 1914, the entire class became known as simply class C.

Most of the rebuilds used 18in x 24in cylinders and Joy valve gear to match the existing simple locomotives. However, 75 class J21s were rebuilt using larger 19in diameter cylinders, Stephenson valve gear, and piston valves. Three of the original simple C1 locomotives were also rebuilt like this.

The first superheated boilers were fitted shortly afterwards. Two J21s were fitted with 18 element Schmidt superheaters in 1914. 55 J21s had been superheated by Grouping (1923), with a strong preference for the locomotives with Stephenson valve gear. Only five of the superheated engines did not originally have Stephenson valve gear, but during rebuilding these had the larger cylinders, Stephenson valve gear, and piston valves fitted. Between 1923 and 1925, six more J21s would receive existing superheated boilers. After that, the LNER stopped the process of superheater fitting for J21s, although boiler exchanges frequently led to J21s gaining or losing superheaters. Between 1923 and 1929, a further 23 saturated J21s received the larger cylinders, Stephenson valve gear, and piston valves. These latter rebuilds stopped when the first J21 was withdrawn (1339 in 1929). Replacement superheated boilers initially kept the Schmidt superheater design, but boilers fitted with Robinson superheaters were used from 1932.

The chimneys were also modified during the late 1930s. During the mid-1930s, some of the J21s were allocated to the GE Area. Drawings were issued to bring the J21s within the GER loading gauge at the end of 1937, however this was issued shortly after the J21s returned to the NE Area. In 1939 with war looking a real possibility, it was envisaged that J21s may well be required to work in the GE Area, and between 1939 and 1942 most of the remaining J21s were cut down to the GER loading gauge. In most cases, this simply involved a change of chimney.

In common with many LNER locomotives built during this era, the class J21s were built with Ramsbottom safety valves but would later receive Ross pop safety valves. The Ross pop valves became a standard J21 fitting before Grouping (1923), but some of the J21s managed to keep their Ramsbottom valves until after Nationalisation (1948).

The J21s were originally built for mineral trains, so only the last thirty were built with any form of train brake. Twenty of these were fitted with Westinghouse brakes, and ten were dual-fitted. However, the J21s saw widespread use on passenger and mixed-traffic work, so it was natural that many more J21s would receive train brakes. By Grouping (1923) only 65 continued to have only steam brakes; 19 were dual fitted; and 117 had Westinghouse-only fittings. With the adoption of vacuum braking by the LNER, 136 J21s received vacuum brakes between 1928 and 1931.

In 1938 there was a proposed plan to rebuild the J21s used on the Darlington-Tebay route. The rebuilds would have used 19x26in cylinders with 8in piston valves, Stephenson valve gear, new crank axles, new frames, and new boilers. The valve gear would have used parts from the D20 4-4-0s and J39s. The frames would have been based on the J39 frames but keeping the J21 wheelbase. The new boiler would have had an operating pressure of 200psi, a diameter of 4ft 6in, and a 12in longer firebox. It would have also been fitted with an 18-element Robinson superheater. The tractive effort was estimated to be 26,060lb, and the axle loading would have been 16 tons. In other words, the end result would have been a powerful locomotive with a notably low axle loading.

The J21s were arguably one of the most successful of the NER’s locomotive classes. They were a ubiquitous feature of the NER scene and at Grouping, 10% of the NER’s locomotive stock consisted of J21s.

Originally built for main line work, the J21s were displaced to secondary workings when the larger NER 4-6-0s were introduced. They continued to perform sterling work on these secondary workings, and regularly hauled passenger branch line workings, and heavy excursion trains.

The wide distribution of J21 class across North East England is illustrated by their 1923 allocation.

Blaydon

17

Darlington

10

Gateshead

8

Heaton

31

Hull Dairycoates

25

Leeds Neville Hill

9

London Road (Carlisle)

8

Middlesborough

13

Shildon

8

Stockton on Tees

13

Sunderland

8

West Hartlepool

14

York

8

Others

29

201

Allocations remained relatively constant until withdrawals began in 1929.

One of the most significant of the regular J21 passenger workings, was the passenger services operated in the Tyneside area. They operated the intensive passenger service on the Newcastle to South Shields line until it was electrified in 1938. Sunderland also used them for passenger work which would later be considered to require large three-cylinder tank engines.

The J21s are particularly noted for their work on the Darlington to Kirkby Stephen line over Stainmore Summit. With increasing loads, the LNER tried to replace the J21s with D3 4-4-0s, D23 4-4-0s, and E4 2-4-0s. In order to cope with the vicious weather conditions found on the route, the LNER went so far as to fit rebuilt cabs to the D3s and E4s. Despite these trials and locomotive modifications, none of these classes survived more than five years on the route, and the J21s returned in 1944. Although they were now fifty years old, the J21s would successfully work this difficult route for another ten years. The D23 class were virtually all withdrawn by 1934.

 

 j21 J21 introduced by T W Worsdell in 1886
 d3 small D3 introduced by Ivatt on GNR in 1896. Version fitted with side window cab.
 e4 small E4 introduced by Holden on the GER in 1891. Version fitted with side window cab.

During the above trials of the E4s over Stainmore in 1935, eight J21s were loaned to the GE Area and allocated at Norwich. By 1937 these had been transferred to New England (Peterborough), and over time migrated north via Retford, Boston and Doncaster.

The LNER sold four of the J21s to Harton Coal Co. (South Shields) between 1929 and 1935. These were used on the South Shields, Marsden & Whitburn Colliery Railway. The last of these was 869 (sold in 1931) which received a new boiler in 1951, became a spare locomotive in 1953, and was scrapped at some point after this date.

 

Number in Service

Built Withdrawals

No in Service

1886 Gateshead

11

    11

1887 Gateshead

10

    21

1888 Gateshead

10

    31

1889 Gateshead

50

    81

1890 Gateshead (30) and Darlington (10)

40

  121

1891 Gateshead (20) and Darlington (20)

40

  161

1892 Gateshead

20

  181

1894 Gateshead

20

  201

1895-1928

  201

1929     6

  195

1930

    2

  193

1931

  12

  181

1932

    8

  173

1933

    8

  165

1934

    6

  159

1935

  18

  141

1936

    5

  136

1937

  19

  117

1938

    9

  108

1939-1941

  108

1942

    2

  106

1943

    7

    99

1944

    4

    95

1945

    2

    93

1946

    3

    90

1947

    7

    83

1948

    8

    75

1949

  19

    56

1950

  13

    43

1951

  14

    29

1952

    1

    28

1953

    1

    27

1954

  12

    15

1955

    3

    12

1956

    1

    11

1957

    2

      9

1958

    4

      5

1959

    1

      4

1960

    2

      2

1961

    1

      1

1962

    1

      0

Locomotive allocations during British Railways operation

 

Depot as of January

1948 1951 1954 1958 1960 1961

1962

Alnmouth

1

Alston

1

Blaydon

7

3 2 1

1

Darlington

10

7 6

1

Doncaster

2

Heaton

7

4 2

1

Hexham 1

1

Kirkby Stephen

5

6

2

Leeds Neville Hill

11

3

Middlesborough

1

Northallerton

1

2

1

North Blyth

1

Reedsmouth

1

1

Retford

4

1

Rothbury

1

1

Selby

8

3

South Blyth

3

1 2

1

Stockton on Tees

4

Tweedmouth

4

1

3

Tyne Dock 1 1

1

Wearhead

1

1

1

West Auckland

2

9

7

York

11

2

83

43 27 9 4 2

1

 

Preservation

Back to LNER

Back to Locomotives